We started filming at the beginning of 2011 and finished by March 8th.We followed the storyboard we did throughout the filming.There are 3 persons in our group so each of us contributed to the project.The boy and I(the main girl) were the main characters in the video and the third person in our group did the most of filming.However I also contributed to the project by filming a little bit and providing some things we needed in the video such as photos of the boy and girl.Because our music video has a band performance along the story,we had to find 3 boys who could play pretending to be Green Day.We did one day of filming just the band and we managed to film everything we needed for the band performance part.The filming of the band took place in the TV studio in our college and the equipment required such as quitars,drums,microphones,etc were provided by the band themselves.
However we experienced some difficulties with the shooting during these 2 months.Most of the days we had to film it was raining,so we couldn't do any work outside.As there is a limited amount of equipment in the college such as cameras and Mac laptops/computers,we found it hard to book the equipment outside media lessons and do extra work.Sometimes not all members of the group were present,so this also affected our time for filming.Another difficulty we experienced was finding an extra guy to be in our video,as we needed another boy to be the girl's new boyfriend.
Due to the short amount of media lessons(1 per week),we had to come in in other time such as after the lesson or in other days and do some extra work.Finally we managed to get it all done by mid March and started editting which also takes a lot of time.
Here's the call sheet with all the numbers of members contributed to the music video:
https://docs.google.com/viewer?a=v&pid=explorer&chrome=true&srcid=0B1JR4gOQbA9vNDNlNGE2YTYtYWE0Ni00NGZkLTg1ODUtMzVmNTY0ZWRkZDU4&hl=en&authkey=CP-QpZYJ
No comments:
Post a Comment